{"id":14727,"date":"2018-12-11T13:55:49","date_gmt":"2018-12-11T13:55:49","guid":{"rendered":"https:\/\/sertv.gob.pa\/crisolfm\/?p=14727"},"modified":"2018-12-11T13:55:49","modified_gmt":"2018-12-11T13:55:49","slug":"siemens-gamesa-suministrara-249-mw-para-dos-parques-eolicos-de-enel-en-mexico","status":"publish","type":"post","link":"https:\/\/sertv.gob.pa\/crisolfm\/siemens-gamesa-suministrara-249-mw-para-dos-parques-eolicos-de-enel-en-mexico\/","title":{"rendered":"Siemens Gamesa suministrar\u00e1 249 MW para dos parques e\u00f3licos de Enel en M\u00e9xico"},"content":{"rendered":"<p>Siemens Gamesa Renewable Energy (SGRE) ha firmado un contrato para suministrar 60 aerogeneradores a Enel Green Power, la filial de renovables del grupo italiano Enel, para <strong>dos parques e\u00f3licos en M\u00e9xico<\/strong> con una potencia total combinada de 249 megavatios (MW), inform\u00f3 la compa\u00f1\u00eda. Seg\u00fan el acuerdo, el fabricante suministrar\u00e1 24 unidades de los nuevos aerogeneradores SG 4.5-145, que cuentan con una potencia flexible de 4.2 MW, para el Parque Amistad III y 36 unidades para el Parque Amistad IV, ambos ubicados en Ciudad Acu\u00f1a, al Norte del Estado de Coahuila en M\u00e9xico. Estos proyectos representan el primer pedido a nivel mundial de la nueva generaci\u00f3n de aerogeneradores &#8216;onshore&#8217; mayores de 4 MW de la compa\u00f1\u00eda.<\/p>\n<p>Ambos proyectos, <strong>Parque Amistad III (100 MW)<\/strong> y Parque Amistad IV (149 MW) fueron adjudicados a Enel Green Power durante la subasta mexicana de 2017. El director general &#8216;onshore&#8217; para M\u00e9xico y Latam de Siemens Gamesa, Jorge Lobat\u00f3n, se mostr\u00f3 \u00abmuy emocionado\u00bb de poder suministrar esta nueva generaci\u00f3n de aerogeneradores &#8216;onshore&#8217; a los proyectos de Enel Green Power.<\/p>\n<p>ECOticias<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Siemens Gamesa Renewable Energy (SGRE) ha firmado un contrato para <a href=\"https:\/\/sertv.gob.pa\/crisolfm\/siemens-gamesa-suministrara-249-mw-para-dos-parques-eolicos-de-enel-en-mexico\/\"> [&#8230;]<\/a><\/p>\n","protected":false},"author":64,"featured_media":14728,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-14727","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ecologicas"],"_links":{"self":[{"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/posts\/14727","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/users\/64"}],"replies":[{"embeddable":true,"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/comments?post=14727"}],"version-history":[{"count":1,"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/posts\/14727\/revisions"}],"predecessor-version":[{"id":14729,"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/posts\/14727\/revisions\/14729"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/media\/14728"}],"wp:attachment":[{"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/media?parent=14727"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/categories?post=14727"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sertv.gob.pa\/crisolfm\/wp-json\/wp\/v2\/tags?post=14727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}