{"id":34223,"date":"2019-01-11T14:36:17","date_gmt":"2019-01-11T14:36:17","guid":{"rendered":"https:\/\/sertv.gob.pa\/nacionalfm\/?p=34223"},"modified":"2019-01-11T14:36:17","modified_gmt":"2019-01-11T14:36:17","slug":"autoridades-de-etesa-efectuan-reunion-de-homologacion-para-iv-linea-de-transmision-electrica","status":"publish","type":"post","link":"https:\/\/sertv.gob.pa\/nacionalfm\/autoridades-de-etesa-efectuan-reunion-de-homologacion-para-iv-linea-de-transmision-electrica\/","title":{"rendered":"Autoridades de ETESA, efect\u00faan reuni\u00f3n de homologaci\u00f3n para IV L\u00ednea de Transmisi\u00f3n El\u00e9ctrica"},"content":{"rendered":"<p>Autoridades de la Empresa de Transmisi\u00f3n El\u00e9ctrica, S.A. (ETESA), llevaron a cabo una reuni\u00f3n de homologaci\u00f3n de los pliegos de especificaciones del proyecto de ingenier\u00eda de dise\u00f1o, construcci\u00f3n,\u00a0suministro e instalaci\u00f3n, puesta en marcha, operaci\u00f3n y mantenimiento de la Cuarta L\u00ednea Chiriqu\u00ed Grande-Panam\u00e1 III 500KV y subestaciones asociadas. El documento, el cual \u00a0cuenta con m\u00e1s de mil p\u00e1ginas, reposa en el sistema electr\u00f3nico de contrataciones p\u00fablicas de la Rep\u00fablica de Panam\u00e1.<\/p>\n<p>\u201cConsiderando el tiempo que toma el desarrollo de un proyecto de esta magnitud, que usualmente es de 3 a 4 a\u00f1os, estamos dando cumplimiento al plan de expansi\u00f3n del sistema interconectado nacional aprobado en tiempo oportuno para que la l\u00ednea inicie operaciones en el primer semestre de 2023. Con esto buscamos evitar que se repitan situaciones del pasado que ocasion\u00f3 pagos que superan los 130 millones de d\u00f3lares en generaci\u00f3n obligada y desplazada\u201d, declar\u00f3 Gilberto Ferrari, gerente general de ETESA.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Autoridades de la Empresa de Transmisi\u00f3n El\u00e9ctrica, S.A. (ETESA), llevaron <a href=\"https:\/\/sertv.gob.pa\/nacionalfm\/autoridades-de-etesa-efectuan-reunion-de-homologacion-para-iv-linea-de-transmision-electrica\/\"> [&#8230;]<\/a><\/p>\n","protected":false},"author":9,"featured_media":34225,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-34223","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacionales"],"_links":{"self":[{"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/posts\/34223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/comments?post=34223"}],"version-history":[{"count":1,"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/posts\/34223\/revisions"}],"predecessor-version":[{"id":34226,"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/posts\/34223\/revisions\/34226"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/media\/34225"}],"wp:attachment":[{"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/media?parent=34223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/categories?post=34223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sertv.gob.pa\/nacionalfm\/wp-json\/wp\/v2\/tags?post=34223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}